Knitting Completion Calculator
Estimate a knitting finish date from remaining sections, rows or repeats, measured minutes per unit and your weekly session calendar.
Starts with an editable example. Replace the dates and rules with your own.
Your calculation
Ready when you are
Choose your dates.
Select your counting rules and calculate.
Calculation details
| Step | Value |
|---|
How to use this calculator
List sections in order and enter remaining units with measured time per unit. Add weekly sessions and unavailable dates within the planning range.
Section work can continue across sessions and multiple sections can share a date. Zero remaining work takes no capacity. The report shows any work that cannot fit.
A worked example
Forty body rows at five minutes, sixty sleeve repeats at three minutes and ten finishing repeats at four minutes total 420 minutes. The example calendar finishes November 14, 2026.
Does every row take the same time?
Not necessarily. Separate sections with different construction or pace, using measurements from your project rather than a generic speed.
Which calendar and years are supported?
Use Gregorian dates from 1900 through 2100, with results in that range. Daily plans allow up to 366 dates; dark-sky searches allow 31 nights. Durations, capacities and policy rules are supplied by you. Astronomy uses the bundled Astronomy Engine, sea-level geometry and browser time-zone rules. Timed exports use UTC instants; date-only events do not assign a clock time. Copy, CSV and print include calculation assumptions. Nothing is booked or scheduled outside this page.
What happens to my dates?
Calculations run on your device. Saving a calculation is optional and keeps it in this browser. A setup link contains the dates and settings you entered; anyone with the link can read them. Use one tab per saved calculator. Clear saved data from Privacy & settings.